GEE PROJECT_MAY 2012

gregperger's Stories

Create Story

SECOND FOOTING 

Taken: May 13, 2012

  • 0
  • 0

24" CUBED FOOTING 

Taken: May 13, 2012

  • 0
  • 0

CONCRETE ADDED 

Taken: May 13, 2012

  • 0
  • 0

AREA EXPANDED 

Taken: May 13, 2012

  • 0
  • 0

FOOTINGS POURED 

Taken: May 13, 2012

  • 0
  • 0

4 X 6 STEEL POSTS SET 

Taken: May 13, 2012

  • 0
  • 0

PRE-PAINTED MATERIALS 

Taken: May 13, 2012

  • 0
  • 0

CONCRETE FORMS 

Taken: May 13, 2012

  • 0
  • 0

LEDGER INSTALLED 

Taken: May 13, 2012

  • 0
  • 0

LAYING OUT RAFTER PLACEMENT 

Taken: May 13, 2012

  • 0
  • 0

TIEING INTO EXISTING COLUMN 

Taken: May 13, 2012

  • 0
  • 0

SECOND BEAM INSTALLED 

Taken: May 13, 2012

  • 0
  • 0

RAFTERS HUNG ON DECORATIVE HANGERS 

Taken: May 13, 2012

  • 0
  • 0

RAFTERS INSTALLED 

Taken: May 13, 2012

  • 0
  • 0

THE DESIGNER/BUILDER 

Taken: May 13, 2012

  • 0
  • 0

20' X 28' X 9' WOOD STRUCTURE 

Taken: May 13, 2012

  • 0
  • 0

4" X 10" DOUBLE BEAMS 

Taken: May 13, 2012

  • 0
  • 0

4" X 6" RAFTERS, 24" SPACING 

Taken: May 13, 2012

  • 0
  • 0

 

Taken: May 13, 2012

  • 0
  • 0

2" X 4" SLATS, 7"OC 

Taken: May 13, 2012

  • 0
  • 0

STONE VENEER BEING APPLIED 

Taken: May 13, 2012

  • 0
  • 0

LIGHTING ROUTED 

Taken: May 13, 2012

  • 0
  • 0

 

Taken: May 13, 2012

  • 0
  • 0

KITCHEN STARTS 

Taken: May 13, 2012

  • 0
  • 0