SECOND FOOTING
Taken: May 13, 2012
24" CUBED FOOTING
CONCRETE ADDED
AREA EXPANDED
FOOTINGS POURED
4 X 6 STEEL POSTS SET
PRE-PAINTED MATERIALS
CONCRETE FORMS
LEDGER INSTALLED
LAYING OUT RAFTER PLACEMENT
TIEING INTO EXISTING COLUMN
SECOND BEAM INSTALLED
RAFTERS HUNG ON DECORATIVE HANGERS
RAFTERS INSTALLED
THE DESIGNER/BUILDER
20' X 28' X 9' WOOD STRUCTURE
4" X 10" DOUBLE BEAMS
4" X 6" RAFTERS, 24" SPACING
2" X 4" SLATS, 7"OC
STONE VENEER BEING APPLIED
LIGHTING ROUTED
KITCHEN STARTS